§ Scope: IGBC
Process – Sustainable Architecture & Design – Site Selection & Planning
– Water Conservation
§ 20 marks –
20 minutes
§ Choose the
correct option (only 1) for each question
1. Match the
following.
Strategy
|
Intent
|
||
A
|
Potable water
|
1
|
Water from toilets containing fecal matter
|
B
|
Grey water
|
2
|
Water from sinks, showers, etc.
|
C
|
Black water
|
3
|
Drinkable water
|
2. To achieve
IGBC ratings, a project must satisfy….?
3. How long
does a project team have to appeal the rating?
4. Match the
strategy with the intent.
Strategy
|
Intent
|
||
A
|
Xeri-scaping
|
1
|
Reduce water demand for irrigation
|
B
|
Drip irrigation system
|
2
|
Reduce municipal water demand
|
C
|
Rainwater harvesting
|
3
|
Improve water performance of the building
|
D
|
Building-level Metering
|
4
|
Minimum
water consumption
|
5. Calculate
the runoff volume if Surface area = 1000 sqm., Runoff coefficient = 0.9,
Rainfall = 200 mm
6. The
strategy of using high solar reflective index to cover exposed roof area is
used for what purpose?
7. Which
statement is False?
in the building
8. Which of
the following is an appropriate site?
9. Plant
factor refers to?
10. Which of the following is the most efficient
irrigation system?
11.What is the
total daily water consumption in following case?
Fixture type
|
Max. flow
rate
|
Duration
|
Estimated
daily uses
|
Water Closet
|
6 LPF
|
2 flush
|
|
Urinals
|
4 LPF
|
2 flush
|
|
Faucet
|
6 LPM
|
15 seconds
|
4
|
Showerhead
|
10 LPM
|
5 minutes
|
1
|
12.Which topic
is covered in ASHRAE 90.1?
13.Which strategy
is appropriate for controlling soil erosion?
14. Which of
the following street lighting is best to increase the night sky access?
15. A:
Bioswales provide good treatment of storm water runoff
B: Vehicle Tracking Control helps prevent Construction
Activity
Pollution
16. Damage to
site and negative environmental impacts can be minimised by?
17. Which of
the following is the objective of exterior light pollution reduction?
18. Which of
the following strategy is not a passive architectural design feature?
19. If a
project is achieving 45 credits and missing one pre requisite, can it still
apply for certification?
20. A: Use of
turf on the site should be maximised to conserve water.
B: Treated wastewater can be reused for landscaping,
flushing and cooling tower make-up water
Pl. check answer for Q. 14 and let give justification for it.
ReplyDelete