Solutions to IGBC AP Practice Questions - Part 1


 1.      What does LEED stand for?
Leadership in Energy & Environment Design

 2.      Which was the first LEED Platinum rated building in India?
CII-Sohrabji Godrej Green Business Centre

 3.      Which credit and how many points are awarded to a project with IGBC AP as a principal design team member?
Innovation, one point

 4.      Which process gives the developer a unique advantage to market the project to potential buyers?
Precertification Process

 5.      What process is used if there is a possibility that the design team may encounter certain challenges in applying or interpreting a mandatory requirement or a credit?
Credit Interpretation Ruling

 6.      How often should project team update IGBC on status of project after pre certification?
Every 6 months

 7.      How long does IGBC take to perform preliminary review?
30 working days

 8.      Which of the following is not a major chapter in IGBC rating system?
Culture and Diversity

9.      The strategy of using high solar reflective index to cover exposed roof area is used for what purpose?
To minimise heat island effect


 10.      Which of the following is a mandatory requirement?
Soil Erosion Control

 11.      Match the strategy with the intent.

Strategy
Intent
A
Braille and audio assistance in lifts
1
providing safe and healthy work conditions
B
Personal protective equipment
2
Minimise heat island effect
C
Use Compressed Natural Gas (CNG) powered vehicles
3
Ensure that the building design caters to differently abled
D
Provide parking spaces under cover
4
reducing negative impacts resulting from fossil
fuel

A-3   B-1   C-4   D-2

 12.      Which of the following is not a basic service?
Airport

 13.      Which of the following is the objective of exterior light pollution reduction?
Reduce impact on nocturnal environment

 14.      Which of the following strategy is used for prevention of construction activity pollution?
All of the above (Earth Dike, Mulching, Silt Fence)

 15.      Which of the following strategy is not a passive architectural design feature?
Seeding

 16.      Projection Factor for following window is ?
A=3 B=9
PF = Horizontal / Vertical = A / B = 3 / 9 = 0.33
0.33


 17.      If a project is achieving 45 credits and missing one pre requisite, can it still apply for certification?
No

 18.      The Precertification is valid for how long from the date of award?
3 years

 19.      How many CIRs are answered without levying any fee?
2

 20.      SRI is a measure of a material’s ability to
reflect solar heat




Sunday, 25 September 2016

IGBC AP Practice Questions - Part 1














§ 20 marks – 20 minutes
§ Scope: Green New Buildings Rating system (Introduction - Overview & Process - Sustainable Architecture and Design)
§  Choose the correct option (only 1) for each question

 1.      What does LEED stand for?
Low Energy Electron Diffraction
Leadership in Energy & Environment Design
Last Environmental Energy Day
Light Extra Energy Design

 2.      Which was the first LEED Platinum rated building in India?
India Habitat Centre, Delhi        
Signature Towers, Gurgaon
CII-Sohrabji Godrej Green Business Centre
Microsoft Building, Hyderabad

 3.      Which credit and how many points are awarded to a project with IGBC AP as a principal design team member?
Sustainable Architecture and Design, two points
Innovation, two points
Sustainable Architecture and Design, one point
Innovation, one point

 4.      Which process gives the developer a unique advantage to market the project to potential buyers?
Credit Interpretation Ruling
Precertification Process
Appeal process
Integrated Design process

 5.      What process is used if there is a possibility that the design team may encounter certain challenges in applying or interpreting a mandatory requirement or a credit?
Credit Interpretation Ruling
Precertification Process
Appeal process
Integrated Design process

 6.      How often should project team update IGBC on status of project after pre certification?
Every week
Every month
Every 6 months
Every year

 7.      How long does IGBC take to perform preliminary review?
10 working days
15 working days
20 working days
30 working days

 8.      Which of the following is not a major chapter in IGBC rating system?
Water Conservation
Indoor Environmental Quality
Culture and Diversity
Innovation and Development
  
 9.      The strategy of using high solar reflective index to cover exposed roof area is used for what purpose?
Outdoor Light Pollution Reduction
Minimising negative impact on the ozone layer
To minimise heat island effect
Enhance ground water table

 10.  Which of the following is a mandatory requirement?
Basic Facilities for Construction Workforce
Passive Architecture
Proximity to Public Transport
Soil Erosion Control

 11.  Match the strategy with the intent.

Strategy
Intent
A
Braille and audio assistance in lifts
1
providing safe and healthy work conditions
B
Personal protective equipment
2
Minimise heat island effect
C
Use Compressed Natural Gas (CNG) powered vehicles
3
Ensure that the building design caters to differently abled
D
Provide parking spaces under cover
4
reducing negative impacts resulting from fossil
fuel

A-2   B-3   C-1   D-4
A-3   B-1   C-2   D-4
A-1   B-3   C-4   D-2
A-3   B-1   C-4   D-2

 12.  Which of the following is not a basic service?
Airport
Hospital
Beauty clinic
Theater

 13.  Which of the following is the objective of exterior light pollution reduction?
Reduce impact on nocturnal environment
Reduce lighting energy consumption
Reduce lighting wattage
To turn off non-emergency lighting

 14.  Which of the following strategy is used for prevention of construction activity pollution?
Earth Dike
Mulching
Silt Fence
All of the above

 15.  Which of the following strategy is not a passive architectural design feature?
Skylight
Earth-air tunnel
Seeding
Building orientation
  
 16.  Projection Factor for following window is ?
   A=3 B=9

0.1
0.33
3
9

 17.  If a project is achieving 45 credits and missing one pre requisite, can it still apply for certification?
Yes, after paying some fees
Yes, if IGBC AP is involved in project
Yes, if applying for the first time
No

 18.  The Pre-certification is valid for how long from the date of award?
1 year
2 years
3 years
It is valid forever

 19.  How many CIRs are answered without levying any fee?
0
2
3
5

 20.   SRI is a measure of a material’s ability to
retain solar heat
transmit solar heat
reflect solar heat
none of the above