1. What does
LEED stand for?
2. Which was
the first LEED Platinum rated building in India?
3. Which
credit and how many points are awarded to a project with IGBC AP as a principal
design team member?
4. Which
process gives the developer a unique advantage to market the project to
potential buyers?
5. What
process is used if there is a possibility that the design team may encounter
certain challenges in applying or interpreting a mandatory requirement or a
credit?
6. How often
should project team update IGBC on status of project after pre certification?
7. How long
does IGBC take to perform preliminary review?
8. Which of
the following is not a major chapter in IGBC rating system?
9. The strategy of using high solar reflective index to cover exposed roof area is used for what purpose?
10. Which of
the following is a mandatory requirement?
11. Match the
strategy with the intent.
Strategy
|
Intent
|
||
A
|
Braille and audio assistance in lifts
|
1
|
providing safe and healthy work conditions
|
B
|
Personal protective equipment
|
2
|
Minimise heat island effect
|
C
|
Use Compressed Natural Gas (CNG) powered vehicles
|
3
|
Ensure that the building design caters to
differently abled
|
D
|
Provide parking spaces under cover
|
4
|
reducing
negative impacts resulting from fossil
fuel
|
12. Which of
the following is not a basic service?
13. Which of
the following is the objective of exterior light pollution reduction?
14. Which of
the following strategy is used for prevention of construction activity
pollution?
15. Which of
the following strategy is not a passive architectural design feature?
16. Projection
Factor for following
window is ?
A=3 B=9
PF = Horizontal / Vertical = A / B = 3 / 9 = 0.33
17. If a
project is achieving 45 credits and missing one pre requisite, can it still
apply for certification?
18. The
Precertification is valid for how long from the date of award?
19. How many CIRs
are answered without levying any fee?
20. SRI is a
measure of a material’s ability to