Pages

Monday, 26 September 2016

Solutions to IGBC AP Practice Questions - Part 1


 1.      What does LEED stand for?
Leadership in Energy & Environment Design

 2.      Which was the first LEED Platinum rated building in India?
CII-Sohrabji Godrej Green Business Centre

 3.      Which credit and how many points are awarded to a project with IGBC AP as a principal design team member?
Innovation, one point

 4.      Which process gives the developer a unique advantage to market the project to potential buyers?
Precertification Process

 5.      What process is used if there is a possibility that the design team may encounter certain challenges in applying or interpreting a mandatory requirement or a credit?
Credit Interpretation Ruling

 6.      How often should project team update IGBC on status of project after pre certification?
Every 6 months

 7.      How long does IGBC take to perform preliminary review?
30 working days

 8.      Which of the following is not a major chapter in IGBC rating system?
Culture and Diversity

9.      The strategy of using high solar reflective index to cover exposed roof area is used for what purpose?
To minimise heat island effect


 10.      Which of the following is a mandatory requirement?
Soil Erosion Control

 11.      Match the strategy with the intent.

Strategy
Intent
A
Braille and audio assistance in lifts
1
providing safe and healthy work conditions
B
Personal protective equipment
2
Minimise heat island effect
C
Use Compressed Natural Gas (CNG) powered vehicles
3
Ensure that the building design caters to differently abled
D
Provide parking spaces under cover
4
reducing negative impacts resulting from fossil
fuel

A-3   B-1   C-4   D-2

 12.      Which of the following is not a basic service?
Airport

 13.      Which of the following is the objective of exterior light pollution reduction?
Reduce impact on nocturnal environment

 14.      Which of the following strategy is used for prevention of construction activity pollution?
All of the above (Earth Dike, Mulching, Silt Fence)

 15.      Which of the following strategy is not a passive architectural design feature?
Seeding

 16.      Projection Factor for following window is ?
A=3 B=9
PF = Horizontal / Vertical = A / B = 3 / 9 = 0.33
0.33


 17.      If a project is achieving 45 credits and missing one pre requisite, can it still apply for certification?
No

 18.      The Precertification is valid for how long from the date of award?
3 years

 19.      How many CIRs are answered without levying any fee?
2

 20.      SRI is a measure of a material’s ability to
reflect solar heat




2 comments: