Solutions to IGBC AP Practice Questions - Part 1


 1.      What does LEED stand for?
☐ Leadership in Energy & Environment Design

 2.      Which was the first LEED Platinum rated building in India?
☐ CII-Sohrabji Godrej Green Business Centre

 3.      Which credit and how many points are awarded to a project with IGBC AP as a principal design team member?
☐ Innovation, one point

 4.      Which process gives the developer a unique advantage to market the project to potential buyers?
☐ Precertification Process

 5.      What process is used if there is a possibility that the design team may encounter certain challenges in applying or interpreting a mandatory requirement or a credit?
☐ Credit Interpretation Ruling

 6.      How often should project team update IGBC on status of project after pre certification?
☐ Every 6 months

 7.      How long does IGBC take to perform preliminary review?
☐ 30 working days

 8.      Which of the following is not a major chapter in IGBC rating system?
☐ Culture and Diversity

9.      The strategy of using high solar reflective index to cover exposed roof area is used for what purpose?
☐ To minimise heat island effect


 10.      Which of the following is a mandatory requirement?
☐ Soil Erosion Control

 11.      Match the strategy with the intent.

Strategy
Intent
A
Braille and audio assistance in lifts
1
providing safe and healthy work conditions
B
Personal protective equipment
2
Minimise heat island effect
C
Use Compressed Natural Gas (CNG) powered vehicles
3
Ensure that the building design caters to differently abled
D
Provide parking spaces under cover
4
reducing negative impacts resulting from fossil
fuel

☐ A-3   B-1   C-4   D-2

 12.      Which of the following is not a basic service?
☐ Airport

 13.      Which of the following is the objective of exterior light pollution reduction?
☐ Reduce impact on nocturnal environment

 14.      Which of the following strategy is used for prevention of construction activity pollution?
☐ All of the above (Earth Dike, Mulching, Silt Fence)

 15.      Which of the following strategy is not a passive architectural design feature?
☐ Seeding

 16.      Projection Factor for following window is ?
A=3 B=9
PF = Horizontal / Vertical = A / B = 3 / 9 = 0.33
☐ 0.33


 17.      If a project is achieving 45 credits and missing one pre requisite, can it still apply for certification?
☐ No

 18.      The Precertification is valid for how long from the date of award?
☐ 3 years

 19.      How many CIRs are answered without levying any fee?
☐ 2

 20.      SRI is a measure of a material’s ability to
☐ reflect solar heat




Sunday, 25 September 2016

IGBC AP Practice Questions - Part 1














§ 20 marks – 20 minutes
§ Scope: Green New Buildings Rating system (Introduction - Overview & Process - Sustainable Architecture and Design)
§  Choose the correct option (only 1) for each question

 1.      What does LEED stand for?
☐ Low Energy Electron Diffraction
☐ Leadership in Energy & Environment Design
☐ Last Environmental Energy Day
☐ Light Extra Energy Design

 2.      Which was the first LEED Platinum rated building in India?
☐ India Habitat Centre, Delhi        
☐ Signature Towers, Gurgaon
☐ CII-Sohrabji Godrej Green Business Centre
☐ Microsoft Building, Hyderabad

 3.      Which credit and how many points are awarded to a project with IGBC AP as a principal design team member?
☐ Sustainable Architecture and Design, two points
☐ Innovation, two points
☐ Sustainable Architecture and Design, one point
☐ Innovation, one point

 4.      Which process gives the developer a unique advantage to market the project to potential buyers?
☐ Credit Interpretation Ruling
☐ Precertification Process
☐ Appeal process
☐ Integrated Design process

 5.      What process is used if there is a possibility that the design team may encounter certain challenges in applying or interpreting a mandatory requirement or a credit?
☐ Credit Interpretation Ruling
☐ Precertification Process
☐ Appeal process
☐ Integrated Design process

 6.      How often should project team update IGBC on status of project after pre certification?
☐ Every week
☐ Every month
☐ Every 6 months
☐ Every year

 7.      How long does IGBC take to perform preliminary review?
☐ 10 working days
☐ 15 working days
☐ 20 working days
☐ 30 working days

 8.      Which of the following is not a major chapter in IGBC rating system?
☐ Water Conservation
☐ Indoor Environmental Quality
☐ Culture and Diversity
☐ Innovation and Development
  
 9.      The strategy of using high solar reflective index to cover exposed roof area is used for what purpose?
☐ Outdoor Light Pollution Reduction
☐ Minimising negative impact on the ozone layer
☐ To minimise heat island effect
☐ Enhance ground water table

 10.  Which of the following is a mandatory requirement?
☐ Basic Facilities for Construction Workforce
☐ Passive Architecture
☐ Proximity to Public Transport
☐ Soil Erosion Control

 11.  Match the strategy with the intent.

Strategy
Intent
A
Braille and audio assistance in lifts
1
providing safe and healthy work conditions
B
Personal protective equipment
2
Minimise heat island effect
C
Use Compressed Natural Gas (CNG) powered vehicles
3
Ensure that the building design caters to differently abled
D
Provide parking spaces under cover
4
reducing negative impacts resulting from fossil
fuel

☐ A-2   B-3   C-1   D-4
☐ A-3   B-1   C-2   D-4
☐ A-1   B-3   C-4   D-2
☐ A-3   B-1   C-4   D-2

 12.  Which of the following is not a basic service?
☐ Airport
☐ Hospital
☐ Beauty clinic
☐ Theater

 13.  Which of the following is the objective of exterior light pollution reduction?
☐ Reduce impact on nocturnal environment
☐ Reduce lighting energy consumption
☐ Reduce lighting wattage
☐ To turn off non-emergency lighting

 14.  Which of the following strategy is used for prevention of construction activity pollution?
☐ Earth Dike
☐ Mulching
☐ Silt Fence
☐ All of the above

 15.  Which of the following strategy is not a passive architectural design feature?
☐ Skylight
☐ Earth-air tunnel
☐ Seeding
☐ Building orientation
  
 16.  Projection Factor for following window is ?
   A=3 B=9

☐ 0.1
☐ 0.33
☐ 3
☐ 9

 17.  If a project is achieving 45 credits and missing one pre requisite, can it still apply for certification?
☐ Yes, after paying some fees
☐ Yes, if IGBC AP is involved in project
☐ Yes, if applying for the first time
☐ No

 18.  The Pre-certification is valid for how long from the date of award?
☐ 1 year
☐ 2 years
☐ 3 years
☐ It is valid forever

 19.  How many CIRs are answered without levying any fee?
☐ 0
☐ 2
☐ 3
☐ 5

 20.   SRI is a measure of a material’s ability to
☐ retain solar heat
☐ transmit solar heat
☐ reflect solar heat
☐ none of the above